Substrate processing Phenomenon: Before painting latex paint, if the wall substrate is not clean, leaving dust, greasy and other things, it will cause latex paint off, discoloration, tile paste is not strong and other issues; if the wet wall without prior varnish "Back cover" can also cause water vapor to seep, and watermarks and peelings appear on the paint. Reminder: Substrate treatment is the first step in construction, and it is also a key step that directly affects the following aspects. Before painting the wall, you should first check whether there is a large hole in the wall and you need to fill it first, then remove the original wall covering. The wall repairing place is sanded to ensure that the texture is consistent with the large area after the repair, and the floating ash is cleaned to ensure that the coating layer is firmly bonded to the base layer. Ground leveling Phenomenon: Many consumers will find that there is a tilting phenomenon at the edge of the wooden floor of the home, especially near the corners of the wall. The important reason is that some workers are not careful enough or intentionally shoddy before laying, and some Even pave the yellow sand. Warm reminder: Before laying the floor, first measure the flatness of the ground. If the ground flatness is much worse, it is recommended to use a cement mortar to level the leveling. After the leveling, the ground hitting should have no sense of emptyness and there should be no sanding on the ground. After leveling the ground with cement mortar, be sure to wait for the ground to dry. Use a dedicated level ruler to determine the flatness of the entire floor before installing the floor. Wall slot Phenomenon: In order to bury the exposed pipelines, the construction team must slot the walls and the ground. However, some workers are barbaric in their operations. It is not clear whether they are slotted at random on the load-bearing wall, which will damage the building's load-bearing structure and reduce the earthquake resistance of the house. Warm reminder: first go to the property or the developer to understand the position of the load-bearing wall, do not move the load-bearing wall. Then determine the alignment and position of all the lines so that they can be accurately positioned when grooving. The depth of the groove is approximately 1.5 cm more than the diameter of the pipeline (including the wall thickness of the pipeline), and the distance from the wall of the pipeline is 1.5 cm from the wall to ensure that the cement, wall or wall finishes are sealed. Not to crack Sewer line Phenomenon: If water pipes and fittings are not sealed properly, it is easy to leak water. In the renovated bathroom, the basin's position often shifts to a location that is offset from the entrance to the sink, and it is often difficult to use the plumbing that comes with the basin. The installation workers are trying to save trouble and generally do not make S-bends, resulting in the direct passage of the washbasin and the sewer, and the odor will come from the sewer. Reminder: After the completion of the waterway construction, check whether the water is unobstructed. First use pots of water, and then fill the water at various places. These are the basin water, the bathtub water, the toilet water, the kitchen and the toilet, and the balcony floor drain. Each water inlet should be poured into two basins of water. Sound, and no surface water is considered normal. The construction process must supervise the installation of S bends and odor-resistant floor drains. Circuit modification Phenomenon: Some construction team electricians do not wire according to the construction requirements, all kinds of different lines take the same line, such as the television antenna, telephone line and distribution line into the same casing, so that the reception of television, telephone interference; The insulation and moisture-proof treatment of joints are not good, and open circuit, short circuit and other phenomena occur; even the lines that do the concealed treatment to reduce the cost have no casing, and the result is that the leakage is light and the safety of the house and the owner's life are threatened. Reminder: In construction, consumers must supervise the electrician to strictly follow the operating procedures for construction and avoid modification while constructing. Before the construction is carried out, a circuit modification plan must be requested to indicate the direction and specific location of the wire, and in particular, the joints of the pipeline should be marked. If there is a change in the construction process, the owner should also communicate with the designer and draw a remodeling plan before starting the construction so that if a failure occurs later, the owner can easily find the line location. Three trees Lacquer Facade Decoration Paint Cement TV Decoration Houses Latex paint Flooring tiles Kitchen wall tiles Bathroom design Bathroom wall tiles Bathroom tiles Toilets for the whole bathroom Leaking tile adhesive Floor tiles Balcony Tiles Decoration Home Kitchen tiles stainless steel welded pipe fittings Stainless Steel Welded Pipe Fittings,Stainless Steel Hex Nipple,Reducer Hex Nipple,Reducer Hex Nipple For Gas WENZHOU LUWEI VALVES AND FITTINGS CO.,LTD , https://www.stainlesssss.com
Guaranteed small details of decoration
The quality of home improvement is closely related to the owner's control of each detail during the construction process. Whether it is a basement treatment, ground leveling, wall grooving, brush painting, tile laying, or circuit reconstruction, if a link is not handled properly, it will have an impact on the overall effect of the living room and the future residence. Therefore, in order to master the university in small details, we can ensure the quality of the decoration.