Precision Machining CNC Aluminium Alloy Anodized Hardware OEM ODM

  • Model NO.: HYNZ
  • Material: Stainless Steel/Aluminium/Alloy Steel
  • Colour: Metal, Gold, Red or Many Other Colour Available
  • Lead Time: 30 Days
  • Trademark: MSG
  • Specification: FDA Approved
  • Finishing: Anodized or at Customer′s Requirement
  • MOQ: 100PCS
  • Process: Precision Machining
  • Standard: ASTM
  • Transport Package: Carton Box
  • Origin: China
Precision Machining Customized CNC Hardware- Aluminium  Alloy/ Stainless Steel/ CRS/ Copper/Brass
Precision Machining CNC Aluminium Alloy Anodized Hardware OEM ODM

1. Produced as per customers' drawings or samples
2. Hight quality CNC machined part at competitive price
3. Tight Tolerence
4. Customized design, shape
5. OEM/ ODM orders are welcome
6. Designing service Provided
7.Material Available: Stainless Steel, Copper, Aluminium, Alloy, CRS, etc
8. Finishing: Zinc Coated, Chrome coated, sand blasted, grained, Anodized, Harden, Blacken
 
Raw Material Stainless Steel, CRS,Aluminium, Copper, Brass, Alloy, Acetal,Galvanized Steel, etc
Spec Material thickness  0.05-100mm
Surface Treatment Anodizing/ Powder coating / Painting/ Power coating /Gold/Silver/Tin/Nickel/Chromium/ Copper-Platting/ Laser Ethcing/Silk screening/ Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
Application All  kinds of  equipment hardware, handles, brakes, nozzles, ringjets, circuits components, connectors, accessories, auto parts, etc
Quotation Please provide the drawings (normally at DWG/STP/PDF file ),and specifications  with material/QTY/surface treatment and other requirements, we will provide precise quotation at our earliest
Prototype and Mould  Prototypes or moulds would be made according to the drawings that confirmed by both of us and customers. Lead time depends on the structure and qty of item, normally, lead time for prototype would take 10-20 days; lead time for mould is 20-45 days;
Production Prior to production, samples would be arranged according to the drawings to customers for approval. Production would start when receiving customer's purchase order with confirmed delivery date and sample. Normally, lead time for production is 15-30 days.
Packaging Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Plastic Pallet/ Fumigated Plywood Pallet. Export carton or any other customized package according to the customers' requests.


Since establishment in 2000, our company-Manufacturing Service Group, has been striving to provide high quality products base on customers' drawings or samples to meet their specific needs.

We've been specializing in CNC machined parts, sheet metal fabrication, deep drawing press, metal wireworks for over 8 years. Hitherto, we've been a reliable OEM supplier in providing CNC machined part,  shop fitting, ringjets, nozzles, auto parts, brake, etc.

In order to serve diverse customer base, we provide designing service and OEM/ODM orders are welcome.

As long as you have an idea, we could work it out!

Supporting Plate Trunnion Sphere

Supporting Plate Trunnion Sphere,Double Bleed Ball Valve,Hard Steel Ball Valve,Trunnion Forged Steel Ball Valve

Antong Valve Co.,Ltd , https://www.atvalveball.com