Laminate flooring, also known as impregnated paper laminated wood flooring, consists of a wear layer, a decorative layer, a substrate layer and a balancing layer. The installation of the laminate floor is generally suspended and the installation is relatively simple and quick. Although the installation is generally the responsibility of the manufacturer, if the owner understands the installation method, it will be of great benefit to the floor installation supervision and acceptance. The first step: processing the ground floor Before paving the laminate floor, you need to make sure the floor is flat and dry. The leveling rate of the ground needs to be up to standard, and the floor of the rough house is generally treated as a concrete floor. The moisture content of the ground should also be noted. If the moisture content is too high, it needs to be treated with moisture. The second step: laying the floor mat The role of the floor mat is to prevent moisture and mute. Before laying the laminate flooring, you need to put a layer of floor mat on the ground. Generally, the laying of the mat should be flat and spread over the entire laying floor without overlapping, and the joints should be tightly bonded with tape. How to save more money on the home improvement network, free design budget quotes. Wet floor and geothermal environment should be laid under the floor mat moisture-proof film. The joints of the width and width should overlap more than 200mm and be tightly bonded with tape. The corners of the wall should be turned up to the same height as the baseboard. Step 3: Install the laminate flooring At present, the edge of the reinforced floor is generally a lock structure with a tongue and groove tongue. When the structure is installed, it is only necessary to ensure that the two types of splicing are tight, and it is not necessary to use a floor glue or the like to connect the floor. Step 4: Install the baseboard The position of the baseboard needs to be reserved between the floor and the wall, usually sandwiched by small wooden blocks. After installing the floor, you can remove the small wooden blocks and install the baseboard. Generally, the baseboard is stuck into the reserved seam and then nailed with special nails. Full Power Emergency Battery Pack The Full power emergency pack is ideal for LED tubes 3-40W Full power emergency output wattage for LED emergency lighting 60-180mins. Automatic lighting up when main power failures. Suitable for LED fitting with external led driver and internal driver. Widely using for parking lot, office, building, warehouse, school, hospital, workshop etc. Emergency Lighting Battery Pack,Emergency Battery Pack For Led Lights,Emergency Power Packs,Bodine Battery Pack,led battery backup ballast Foshan Nai An Lighting Electric Co.,ltd , https://www.ledpowerpack.com