Anti-static floor (1) Clean the ground: The original ground floor should be level, and there is no obvious unevenness. Use a blade to remove the debris on the ground and clean it up. (2) Positioning and paying line: According to the flat size and equipment layout of the room, according to the modulus of the movable floor block, the laying plan and reasonable laying method should be formulated. The following principles should be followed: a. If there is no control cabinet and other equipment in the room, the geometrical dimensions should be laid from the inside to the outside when it meets the modulus of the movable floor panel. b. If the indoor plane size does not meet the plate modulus, the center point of the two directions should be found out, and the difference between the two sides should be seen. If the difference is not obvious, it should be laid from the outside to the inside; if the difference is large, it should be carried out. Symmetrical compartments, laid from the inside out. c. If there is no control cabinet and other equipment on the indoor ground (when the hole is to be reserved), the laying direction and sequence should be considered comprehensively. d. Determine the laying height according to the design requirements. In summary, after the laying method is determined, it is necessary to carry out the work of finding, arranging, dividing, and positioning the line, that is, it is necessary to put the grid line on the ground, and to mark the line on the surrounding wall, so as to facilitate Operational control during construction. (3) Mounting and fixing adjustable brackets and beams: It is necessary to place the adjustable brackets according to the elevation control line drawn on the wall around the room and the framed position on the ground floor, and put the beam on the beam, with small lines and horizontal The ruler adjusts the height of the support to the full height of the room. Each nut of the floor support should be tightened after leveling to form a networked bracket. (4) Laying the raised floor: laying the raised floor block and adjusting the level to ensure that the four corners are flat and tight. When the movable floor block does not meet the modulus, the insufficient part can be inlaid after cutting according to the actual size (fine when cutting the floor). It is fitted with corresponding adjustable brackets and beams. (5) Anti-static grounding: The grounding connection should be made after the installation of the raised floor. The technical performance should meet the design requirements and construction acceptance specifications. Anti-static floor a. base treatment b coating closed primer c laying copper wire, cutting groove d scraping conductive conductive layer paint PVC anti-static floor a, base surface (ground) treatment; b, 镘 scraping self-leveling cement leveling; c, brushing conductive primer; d, laying copper foil into a network; e, paste PVC floor; f, open V-shaped groove at the floor joint; g, plastic welding brazing seam to flatten; h, surface clean; i, anti-static wax. Thermostatic Shower Set,Mixer Shower Set,Thermostatic Tub And Shower Set,Thermostatic Shower Mixer Set Kaiping Rainparty Sanitary Ware Technology Co.,Ltd. , https://www.helin-shower.com