Attention second-hand housing decoration killer makes the home beautiful as new

The quality of second-hand housing varies widely and generally goes through the original owners' decoration. Sometimes the decoration will cover many shortcomings. To do this, you must communicate with the owner more about the internal structure of the house, including the direction of the pipeline, the location of the load-bearing wall, etc. to facilitate future decoration. Before second-hand housing renovation, first of all to a comprehensive physical examination, to understand in advance where the shortcomings of second-hand housing, in order to know what to change, so that second-hand housing is as beautiful as a new home.

<<< link: second-hand housing temperature second-hand housing renovation Raiders

Affect second-hand housing decoration effect 6 big killer

The situation of second-hand housing is numerous and there are many problems to be dealt with. The following six points are the biggest terrorist fatalities affecting second-hand housing. They must be resolved first:

Killer 1. Tile peeling

In the middle of the tile and the cement, the infiltration of air or moisture is likely to cause insufficient adhesion, and the phenomenon of spalling or swelling occurs. Usually, the ratio of cement to sand is not correct during construction, and if the cement bottom is not played properly, this type of problem is more likely to occur.

Killer 2. Wall cancer or wall, wallpaper discoloration and shedding

When there is flaking of paint or wallpaper, it is usually caused by too much water or salt. Therefore, the waterproof treatment of walls and the dilution of wall salts are also important points. For wall cancer, only general waterproofing is not effective, and like waterproofing, construction must be done on a sunny day. It is advisable to ask a company that specializes in wall cancer and water proofing to conduct site surveys and propose solutions. The majority of treatment methods are: dipping the chemical into the wall to dilute the wall salt, and then do waterproofing of the inner and outer layers in 3 days; or use the expansion agent to fill the gap and waterproof the inner and outer layers.

Killer 3. Ceiling, wooden floor or cupboard with locust

Many locusts prefer to feed on wood or wood. They must be wormed immediately after locust occurrence and avoid re-use of horns, timber flooring, and furniture.

<<<Links: Items for second-hand house renovation must be replaced


Killer 4. Rainy ceiling leaks, floor water and seepage

Leakage of the ceiling in addition to its own line out of the situation, but also may be the problem of upstairs tenants, when the door frame or window frame seepage, it means that the depth of the rain cover, or the windowsill waterproof is not done. Therefore, general aluminum doors and windows will be added to rain cover, as well as windows and windows to strengthen the waterproof, as the floor water is a problem with the drainage system.

Killer 5. Too many columns and wooden compartments

Many pillars and compartments are more likely to cause visual obstruction, they will feel less space, and the lighting will be poor, and even a dark gallery will appear. If it is a brick-built cubicle, it is more durable and soundproof. If it is a wooden compartment, its bearing capacity (such as paintings or nail plywood) and sound insulation are not as good as those of a brick wall. Multi-wood compartments are disadvantages.

Killer 6. Poor lighting and poor visibility

In addition to its own structure (windows are too small and too many compartments) to cause poor lighting, there are also problems of too close proximity of the ridges. As long as there is an opportunity to see the buildings on the opposite side of their own architectural style, there will be problems with the distance between buildings. The problem is that the building itself will cause a certain degree of poor lighting, poor visibility, and no privacy. Near the building, the low floor is easy to be blocked, the sun is not easy to direct light, the home is prone to moisture, people are prone to illness, things are prone to mildew, and lights are turned on at home during the day. This is a waste of electricity and money. There are many problems.

Experts suggest: waterproof engineering should be enough

It is necessary to catch leaks first if leaks are found. If leaks are caught, it is necessary to test the leak first and determine the source of the leak and then select the solution. Waterproof construction materials must be sufficient, otherwise there is nothing to do. If the old beams and pillars of the old house were made of wood, they may be changed to H-beams when refitting, because the H-beams are more durable and less susceptible to locusts.

Second-hand housing window cement wallpaper paint space floor tiles cupboard door paintings

Hitachi Elevator Spare Parts

Hitachi Elevator Spare Parts, Hitachi Elevator Parts


Hitachi has been developing and manufacturing elevators and escalators for about 90 years. Social demands on elevators and escalators changed dramatically over time: faster, larger, and barrier-free and required.

History of Hitachi's Elevator and Escalator Business

  • 1924Lift manufacturing at the Kameido plant
  • 1932First elevator delivered (to Tokyo Electric Power)
  • 1937First escalator delivered (to Osaka Railway Department Store)
  • 1956Hitachi Building Services Co., Ltd. founded (currently known as Hitachi Building Systems Co., Ltd.)
  • 1966Hitachi Elevator Engineering Co ., (Hong Kong) Ltd. founded in Hong Kong
  • 1967Construction of an elevator research tower in the Mito plant completed (90m in height)
  • 1968300m ⁄ minute ultra high speed elevator delivered to the Kasumigaseki Building, Japan's first skyscraper
  • 1972Hitachi Elevator Engineering (Singapore) Pte. Ltd. founded in Singapore
  • 1974Delivery of 540m ⁄ minute elevators to skyscrapers in Shinjuku
  • 1987Hitachi Mito Engineering Co., Ltd. founded
  • 1991Siam-Hitachi Elevator Co., Ltd. Founded in Thailand
  • 1998Three affiliated companies in China merged to found Guangzhou Hitachi Elevator Co., Ltd.
  • 2003Opened Hitachi Building Solution Lab
  • 2007Guangzhou Hitachi Elevator Co., Ltd. renamed to Hitachi Elevator (China) Co., Ltd.
  • 2008Hitachi Lift India Pvt. Ltd. foundedDelivered the world's highest class ultra fast double deck elevators to the Shanghai World Financial Center
  • 2009Introduction of the Company systems leads to the establishment of the Urban Planning and Development Systems Company
  • 2010Completed elevator research tower [G1TOWER" (213m in height) for Mito WorksFounded Hitachi Elevator Asia Pte. Ltd. as a general elevators and escalators business company for the Southeast Asia, India, and Middle East regionsCompleted elevator research tower (172m in height) for Hitachi Elevator (Shanghai) Co. Ltd.
  • 2011Founded Hitachi Elevator Philippines CorporationDelivered 600m ⁄ minute elevators to the Al Hamra Mixed-Use Complex in Kuwait.


Hitachi Elevator Spare Parts, Hitachi Elevator Parts

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjsmartcommercialescalators.com