In our bathroom decoration can not be separated from the hardware products, the installation of bathroom hardware requires ergonomics, in line with the living habits of the residents, and to facilitate the use of households as a starting point. Bathroom hardware and sanitary ware has now entered the stage of meeting functional requirements, energy saving and water saving. You must know something about the installation knowledge of bathroom hardware. Today, share the order and skills of bathroom hardware installation. Bathroom hardware installation sequence Inlay wall tiles - suspended ceiling - laying floor tiles - installation of toilets, washbasins, tubs - installation of connection drains - installation of lamps, sockets, mirrors - installation of towel rods and other hardware accessories. 1, the installation order of the toilet Check the floor drain pipe - align the nozzle - level the alignment - draw the mark - punch the hole - put on the putty - put on the rubber pad - screw the nut - the two sides of the water tank on the back of the hole mark - punch - insert Bolt - æ» - - Back tank hoist flat - Screw on the nut - Install the back tank water elbow - Install the splayed door - Insert the float door and the splayed door - Tighten the nut. 2, the installation order of the washbasin Expansion bolts are inserted - æ» - the tube rack is hung - put the washbasin on the rack to find the level - the water connection: the washbasin - straighten - the water connection. 3, the installation order of the tub Installation of the water - the ash is tightly closed - the installation of the water - flattening. Bathroom hardware installation skills 1. Handle installation: Handle installation should be ergonomic and convenient to use. All handles for the same wardrobe must be neat and tidy during installation. The length of all screws should match the thickness of the cabinet door and the drawer surface. When drilling with a drill, the hole size should be the same as the diameter of the screw. 2, the installation of the door hinge: the general door is installed with two hinges of length 100mm, if it is a solid door or concave and convex shape door must use three hinges, or install two hinges of length 125mm. 3, the installation of the lock: after the door lock is installed, the handle should be between 900-1000mm. Install the lock body and the lock tongue first, so that the lock tongue plate is flush with the door edge, close the door, fix the position of the lock plate, and then install the lock plate, and ensure that the lock plate is flush with the edge of the door cover.
Vulcanizing agent can make the rubber linear molecular into a three-dimensional network structure and mechanism through the vulcanizing agent of [bridging", so significantly improved the rubber mechanical and physical properties of rubber.
Ningbo Actmix produces a variety of Rubber Vulcanizing Agent. Our regular vulcanizing agent Actmix®S-80, Actmix®IS60-75, choose high quality powder, and filtered 80 mesh, with excellent dispersion for automotive rubber technical parts. Non-sulfur odor curing agent Actmix®CLD-80 , doesn't form N-nitrosamine, can substitute for Actmix®DTDM-80. Actmix®HMDC-70 & Actmix®TM-70 can be used for AEM/ACM as vulcanizing agent. Actmix®HVA-2-75(PDM-75) is a sulphur-free vulcanization agent, can be used for rubber cable, solve the copper wires due to exposure to sulfur vulcanizing agent generated black copper sulfide pollution problems.
Rubber Vulcanizing Agent Rubber Vulcanizing Agent,Pre-dispersed Rubber Vulcanization,Rubber Vulcanization DTDM-80,EPDM-bound Rubber Vulcanization Ningbo Actmix Rubber Chemicals Co., Ltd. , http://www.actmixchemicals.com