Blank room decoration detailed steps first time decoration necessary literacy knowledge

Many young people are buying the first suite. They have no experience for decorating. They are completely white. The entire renovation process is extremely cumbersome, so that the decoration of the rookie into panic, in fact, the most important thing is to grasp the backbone and focus, such as understanding the detailed steps of the rough room decoration, so as not to make you panic. Here we take a look at the detailed steps of the rough room decoration !

Blank room decoration detailed steps

1. Pre-design - 2. Main body demolition - 3, hydropower reform - 4, tiling - 5, carpentry - 6, brush wall paint - 7, kitchen ceiling - 8, cabinet installation - - 9, wooden door installation - 10, floor installation - 11, paving wallpaper - 12, radiator installation - 13, switch socket installation - 14, lighting installation - 15, hardware and sanitary installation - - - 16 , curtain rod installation - 17, pioneering cleaning - 18, furniture approach - 19, appliance installation - 20, home accessories decoration

Blank room decoration important part

1, pre-design

This is the first thing to do. In fact, it can be started before it is delivered. It needs to be done according to one's own needs or living habits. However, if you have detailed data, you need to measure it yourself. Measurements include: Clearly decorated areas, such as tiling area, wall paint area, wallpaper area, floor area, and the size of furniture placed.

2, the main demolition reform

This is the first project after the start of construction. It is based on the previous plan to demolition and reform. The contents include: knocking on the wall, basement wall, shoveling walls, removing heating, changing steel windows, and so on.

3, hydropower reform

After the above work is completed, it is hydropower, but before we start there is an important thing to do, that is, the first measurement of the cabinet, although the measurement has no actual content, the designer can not give a specific design size, just pre Make recommendations on the location of the left inlet and hood. Mainly include: see whether the position of the smoke machine socket will affect the installation of the smoke machine, see whether the position of the water meter is appropriate, and see if the position of the nozzle is convenient for the installation of the water tank. After the completion of the survey, hydropower reforms can be started. Waterproofing is also recommended.

4, tiling

This is a large project that not only includes the paving of wall tiles, but also several small things to be completed at the same time, such as the installation of passstones and marble windowsills. The former is completed together with the floor tiles, and can also be installed behind the floor tiles; the latter is generally installed after the window coverings are ready, and the glass glue is ready to be sealed with the marble and the window cover. There is also a floor drain installation. It is the first piece of hardware that comes on the floor. It needs to be installed together with the floor tiles, so everyone should buy a floor drain as soon as possible. After the paving of the kitchen tiles, the first appliance smoke machine appeared. After the hood was installed, the second measurement of the cabinet could be performed.

5, woodworking

The masters at this stage have many things to do, but they also differ according to the circumstances of each family. Generally, they include: wardrobes, cabinets, lockers, tatami mats, shoe cabinets, and so on.

6, brush paint

The lacquer is divided into two types: the bottom of the paint and the bottom of the paint. Firstly, the bottom of the lacquer can be removed once. The dust on the wall must be removed beforehand. The brushing must be done evenly. After it is dry, the next step can be performed. Next is the construction of the topcoat, usually on both sides, each time interval is 2-4 hours or more (based on dry paint finish), the second pass needs to wait 1-2 days to completely dry, must pay attention during the period Waterproof, drought-proof, and sunscreen can prevent problems with the paint film.

7, the installation part

The above links are all major projects, basically completed here, and then we must enter the installation steps, such as kitchen cabinet installation, wooden door installation, floor installation, wallpaper shop, hardware and sanitary installation and so on.

8, furniture, home appliances approach

At this point is basically near the end, all kinds of items are almost purchased complete, after the cleaning can enter the market, such as furniture and home appliances, the installation of the installation, after a few months to complete the ventilation ready to stay!

Summary: The above is the detailed steps that Xiao Bian brings to you today. We believe that your friends have a certain understanding. You can refer to the detailed steps for the decoration of the rough house . I hope this article will help you. Oh.

Frame Scaffilding

Frame Scaffilding

As a high quality range of Scaffolding Frames - Standard H Frames is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips


Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

-Whole Aluminum Scaffolding

Frame Scaffilding,Frame Scaffolding,Scaffolding Frames And Accessories,Scaffold Frames Arch

HENGSHUI PIONEER IMP & EXP TRADING CO ., LTD , https://www.hspioneer.com