Decoration inventory tile cabinet production process and installation notes

Cabinets are indispensable in our modern home decoration. It is a platform for storing kitchenware and cooking operations in the kitchen. The use of higher brightness color matching, consists of five major components, cabinets, door panels, hardware, countertops, electrical appliances, so how to install cabinets? Here we come to introduce you: tile cabinet production process and installation precautions.

Tile cabinet making process:

1: First, make sure that the ground level is level, and use a tile to hit the keel to make a 105-cm-high platform

2: floor tile first tile

3: Installation frame

4: After fine-tuning the second tile

5: First install the outer plate

6: Reload the inner plate

7: Install the first inner plate

8: Install the side plate, back plate

9: Packing board

10: After the structural adhesive is loaded, the second laminate is installed

11: PVC laminates are used for the laminates, and the slope structure of the edge strips facilitates hygiene

12: Do other space according to the above procedure

13: see smooth installation of tempered glass veneer, a variety of colors to choose from

14: Laminate double-layer tile structure, increase firmness

15: Install the first roof

16: Install the second top plate

17: Install the table

18: Baseboard processing plus a tile finish to ensure the appearance; skirting line embedded in 4 cm, to ensure that the toe is not easy to kick to the cabinet in use.

Precautions:

1. The water heater should be installed as high as possible, and the cabinet should be packed into an active one for easy maintenance in the future.

2. Cabinets should be leveled and installed. First, the cabinets should be installed first, and then the base cabinets should be installed so as to prevent the ground garbage inside the cabinet from being cleaned.

3. The handle should be straightened and the door must be properly adjusted. The skirting board shall be provided with a sealing strip and a corner connector or plastic standard parts. The gap between the top of the cabinet and the ceiling is treated as blank. In principle, the upper panel is made of solid wood, plastic, or ordinary type. The sink cabinet is in principle without a backplane, and after the interface for maintenance is moved to the sink cabinet, it is best to tile it here. Microwave oven cabinets are preferentially placed in semi-high cabinets or high cabinets. They can also be designed in cabinets. If they must be placed close to the cabinet, they are designed and installed.

4. Hanging cabinet with the method of moving the backplane so that the pipe, the whole floor (on-site digging) borrowed on both sides of the cabinet or wall; there is no adjustment plate on the side of the corner cabinet (can be adjusted with the see-spot of the corner cabinet There is a tower-shaped machine cabinet without adjustment plate; the entire cabinet cabinet adjustment plate shall not exceed 3, and should ensure that the appearance; non-top grid cabinet without adjustment plate; under the premise of accurate measurement and the total length of the wall decoration is very standardized minus 10mm, hanging cabinet can not adjust plate (but there may be non-standard cabinet), non-standard size (core 10mm) can be adjusted on the hood of the hood.

5. The installation height of the hot and cold water pipes and the sink tap connector and the valve is 500mm to facilitate connection of the sink faucet to the hose. When the electrical wiring is arranged, the height of the socket used for the embedded cabinet of the ground cabinet is 300 mm from the ground, the height of the electrical socket used on the table is 1300 mm from the ground, and the height of the socket of the matching appliance with the wall cabinet is 2000 mm, and the socket used by the hood is provided. The height from the ground is 2500mm.

Editor's summary: The process of making ceramic tile cabinets and installation notes are introduced here. I hope I can help you. For more information, please pay attention to this site.

Cabinets Solid wood cabinets Crystal plate Cabinets Cabinets Installation Cabinets

Waterproof coatings are necessary to protect water facilities. Water facilities are often exposed to pressurized water. They also need to withstand the constant attacks of multiple elements, and leaks are common after a few years. UMS-AUPT provides a brush-coated Polyurea Waterproof Coating system for liquid applications that provides long-term protection for simple, detailed or complex water installations.

 

UMS-AUPT brushed polyurea waterproof coating system is widely used in the sealing and waterproofing of concrete water facilities. such as reservoir waterproof coating, Dam Sealer , aqueducts waterproof, water pipes waterproof, Water Tank Sealant, aquariums waterproof and Concrete Pond Sealant.

 

The advantage of UMS-AUPT brushed polyurea waterproof coating system

1. Can be brushed by hand, rolled, and airless if necessary. Construction is fast and flexible. Sealant for Ponds , it can be painted on any curved surface, inclined surface and vertical surface without sag.

2. No solvent, no VOC emission, environmental protection and energy saving; humidity and temperature have little effect on the construction process.

3. Advantageous physical and chemical properties, such as tensile strength, elongation, flexibility, wear resistance, aging resistance, corrosion resistance, etc.

4. High-strength coating, high elasticity and no seam are top-grade waterproof protective coatings with excellent performance.

5. High adhesion and durability to various substrates such as steel, wood, glass, ceramics and concrete. Does not crack or fall off.

Reservoir / Pond Waterproof

Water Tank Sealant,Dam Sealer,Reservoir Waterproof Coating,Sealant for Ponds,Concrete Pond Sealant

UMS New Materials Industry Co.,LTD , https://www.ums-factory.com