The floor is a large area of ​​home improvement decoration materials, but also a relatively high proportion of the proportion of funds, therefore, is very important in the decoration, if the decoration is not good, future cracking, etc. affect the daily use, today Xiao Bian Let us talk about what needs to be paid attention to when laying floorboards! The first step: check the flatness of the ground First of all, to check the level of the floor on which the floor is to be laid, you can use a 2M ruler on the ground to inspect the floor. Use a 3mm thick feeler to check the clearance between the ruler and the ground. If it fails, it passes the pass and fails. If the ground is uneven, it needs to be flattened with a spade blade. If the situation is serious, it should be re-leveled or self-leveling. If the pavement is not leveled and paved, it will cause problems such as floor collapse, warping, arching, and noise. Step 2: Check the ground water content Secondly, to check the moisture content of the ground, you can use the moisture content tester to measure the ground water content, the standard requirement for common ground is <20%, and the floor requirement standard for laying geothermal heat is <10%. If the ground water content is too high, the floor will easily absorb water and expand, causing problems such as arching, drumming, and noise. Therefore, if the ground water content exceeds the standard value, dehumidification is required. Step 3: Check whether the ground is strong Then, to see if the ground is strong, you can tap the ground with a screwdriver handle or boring head to check if the ground is empty or peeling. If the ground is empty or peeling, you need to reprocess the ground. Otherwise, after laying the floor for a period of time, a sound may occur because the floor is not solid. Step 4: Check for waterproofing Then, check whether there is any waterproof measure, because the floor is afraid of water intrusion, the floor will blistering, degumming, deformation and other issues after the water invade, resulting in unusable. Therefore, it is necessary to check whether the waterproof measures are done well before paving. If there is any leakage in the house, the floor should be laid after the treatment. Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia). Floor floor installation Push Shower Valve,Push Button Shower Valve,Push Button Diverter,Push Pull Shower Faucet Moon Shower Sanitaryware Co.,Ltd , https://www.moonshowerglobal.com