Decoration hydropower reform steps hydropower acceptance skills

Hydropower is a hidden project and is a very important part of new house decoration. If you ignore the details, it will cause many troubles later, and even bring about security risks. What are the steps for the renovation of hydropower ? What issues should be paid attention to in the acceptance of water and electricity? Let's learn about it together!

1, decoration and hydropower transformation steps - hydropower positioning

According to the needs of users, the plumber determines the location of the switch sockets in the whole house and the location of the waterway interface. And pay attention to the water pipe walking the ceiling, strong and weak electricity try to walk the ground, and the strong and weak electricity can not cross, parallel distance greater than 30 cm.

2, decoration and hydropower reform steps - distribution box

The installation of the electrical box must be considered convenient, concealed and safe. Also pay attention to the direct connection with the outside main line, electrical lines can not be hidden in the building load-bearing walls, columns and so on.

3, decoration and hydropower transformation steps - sockets, switches, lighting electrical circuit design

The price of the new embedding line and change line is not the same, in order to avoid the late and time-consuming effort. To take into account the variability of the interior space, prepare for different space usage conditions. Such as desks, decorative cabinets, electrical equipment movement on the impact of electricity.

4, decoration and hydropower renovation steps - lamps

In the case of large lamps and lanterns, pay attention to the load-bearing components of the ceiling, and do not install wooden wedges directly. Otherwise, unsafe factors may occur.

5, decoration and hydropower transformation steps - slot

The groove should be kept straight, and there should be no hairy teeth on the groove side. Before hitting the tank, let the plumber direct all the hydropower to the wall.

6, decoration and hydropower transformation steps - waterway

When the waterway is reformed, pay attention to the size of the water pipes in the original room, and the pipes of the external water pipes should be matched with the original water pipes. Hot and cold water pipes should also be relatively pointed, and the spacing should not be less than about 20cm.

Hydropower acceptance skills :

1, water acceptance

After the waterway is changed, use a hose to connect the hot and cold water pipes that have been changed. The space inside the pipe is let go and the water meter is turned off. The cold and hot water pipes of the entire indoor pipe are started to be pressurized. Guaranteed 30 minutes no leakage, pressure drop does not exceed 0.05mp qualified.

2. Acceptance of strong power

Use 500V insulation resistance meter to test the insulation resistance value of various loops. At the same time, it is also a test of the quality of the used wires. The wires with poor quality will be broken down during the test.

3, weak electricity acceptance

Use a network test tool or a multimeter to test whether the 8-core signal of the network is unimpeded. After the test is completed, proceed with the next construction.

Concluding Remarks: The above is the relevant content of the renovation and hydropower reform steps introduced for everyone. The hydropower reform needs careful and careful. Regardless of the size of the changes, it is best to ask a professional to operate. If you still need to learn more about the later stage, you are welcome to pay attention to this site information.

Household Electric Screwdriver

Household Electric Screwdriver,Mini Power Screwdriver,Mini Tool Kit,Screw Driver Power Tool

SUZHOU CREATION SPACE INTELLIGENT TECHNOLOGY CO.,LTD , https://www.mypkey.com