The construction of large-scale ground power stations involves a wide range of operations and involves many personnel. The project manager needs to manage a large number of people, financial resources, and materials, and must coordinate work hours, equipment entry time, and fund payments to ensure that the project is on time and with good quality. The volume is completed. The following is a summary of the work and process of a project manager with rich experience in the construction and management of ground-based photovoltaic power plants. The first stage Ready to work Work 1: Preparation for the project department Include recommended project manager, project department staff, project management plan review, grade 1 network plan preparation and review, project department backup calculation and application) Work 2: Entry into the project department With production and life preparation Work 3: Sitong and Ping Lutong, Dentsu, water, communications, site formation Work 4: temporary construction Work 5: Full Station Wall (Column) Construction Including basic, wall or mesh installation Work 6: Construction team entering and living area construction second stage Civil construction Work 1: Work within the PV array area Work 2: Work in booster area The third phase Output line and opposite end spacing construction Work 1: Concrete Tower Foundation Work 2: Rod and Tower Installation Work 3: Line laying Work 4: Peer interval device basics Work 5: installation of peer equipment (including wiring) Fourth stage Electrical installation engineering Work 1: Electrical Installation in the PV array area Work 2: Electrical installation in the booster station area Work 3: Secondary Equipment Installation and Wiring Phase 5 Commissioning part of the construction Work 1: Single unit commissioning Work 2: Secondary equipment single debugging Work 3: Quality inspection station acceptance and deficiencies Work 4: Quality inspection of grid companies Work 5: System debugging Work 6: Acceptance by the grid company Work 7: System Integration Work 8: Transfer to Production Transfer Work 9: Trial Run Work 10: Defect elimination in the late phase of grid connection Work 11: Data submission Work 12: Transfer of spare parts Work 13: Completed Procedures Work 14: Post-sale Transfer Procedure Led Strip Lights,Led Phyto Lamp Strip Light,Led Plant Grow Strip Lights,Led Light Strips Non-Waterproof Shenzhen You&My Electronic Technology Co., Ltd , https://www.ymledtrade.com