After getting the house, you can arrange the renovation, and the house decoration is a very rigorous thing, must be strictly installed steps to carry out, then, what is the house decoration steps and processes? Here we will introduce in detail: House How long will it take to renovate the steps and processes and how to decorate the new home? House renovation steps and processes: 1, pre-design Before designing, we must first select the decoration company. The general formal decoration company will give the user a complete design drawing, and can help you understand the problems that are easy to appear in the home improvement. In addition, it is also necessary to carry out the housing measurement and make detailed data record. 2, the main demolition reform After the design is completed, the starting date is selected and the entire frame of the house is laid out. The framework of the house is cleared through the steps of demolishing the wall, building walls, shoveling the wall, or removing the heating. 3, hydropower reform After the main body is demolished and reformed, it is necessary to measure the installation position of the cabinet and reserve the position of the water inlet, soot tube, and socket in the installation position. Because hydropower reform is a covert project in home improvement, every detail must be taken seriously in order to avoid causing troubles for later decoration. 4, carpentry, bricklayers, painters After the completion of the hydropower reform, woodworkers, bricklayers, and painters will be able to enter the site in sequence. The first is woodworking. Woodworkers generally include ceiling moldings, large custom wardrobes, and risers. Bricklayers perform basic construction and handling of walls and floors. The painter is doing the last perfect work on the first two projects, such as applying wall paint, furniture finish, and so on. 5, kitchen decoration After the paint is finished, ceilings for kitchens and bathrooms are to be installed, and ceilings for kitchens and toilets are preferably integrated ceilings or aluminum ceilings, because they have a waterproof and antiseptic effect. In addition, cabinets and bathroom fixtures should be installed and installed in strict accordance with the design drawings, so as not to cause subsequent trouble. 6, late installation After the above steps are completed, it is necessary to carry out the post-installation, and the post-installation is a complete project, in which the floor safety, wallpaper covering, electrical installation, lighting installation, hardware installation must be completed at this stage. How long can your new home be renovated? In general, new homes should be vacant for about 2-3 months after they are finished. Pay attention to ventilation, and place activated carbon, green algae, spider plants, photocatalysts, etc. to purify formaldehyde and benzene compounds in the air, because these poisons will not only harm people's health, but also cause respiratory diseases, leukemia, infertility Infertility and other diseases, therefore, most need to be vacant for 2-3 months after check-in, so as not to affect physical health. The article summarizes: The house renovation steps and processes and the knowledge of how long the new home can be renovated will be introduced here. Home decoration is a very troublesome thing. Everyone must learn more about some related aspects before they can be renovated. The effect of doing more with less.
We can produce the lower-temperature Steel Pipe according to the ASTM A333 and ASME SA333 standards, and the and the production
diameter from 8" to 48" in OD and wall thickness from 9.53 mm up to 140mm. We have been sold the GR.6 steel pipe about 20000 tons
to date and the property of -45℃ impact value is about 100J, better than the standard`s
requirements.
Yangzhou Chengde has the full capability to do every
test in-house, from mechanical testing, chemical analysis, PMI, UT/Hydrotest
etc. Chengde`s lab is qualified to ISO 17025 and CNAS standard, being proven
the repeatability of accurate testings.
Each alloy pipe is subject to PMI before
dispatch. The INNOV-X system performs non-destructive chemical analysis via
simultaneous detection and quantification of fluorescent x-rays of multiple
elements in test sample.
A333 Pipe,Astm A333 Pipe,Astm A333 Tube,Gr 6 Pipe YANGZHOU CHENGDE STEEL PIPE CO.,LTD , https://www.chengdepipe.com