Acceptance In addition to identifying the overall effect of decoration, the main thing is to see if the quality of the decoration is qualified. Acceptance can be identified from the following aspects. (1) The lighting circuit shall be laid in accordance with the regulations. The socket, lighting switch, main gate, and leakage switch shall have a certain height, and the kitchen and air-conditioning shall be laid in dedicated lines. The television antenna and telephone line shall be installed in a position convenient for maintenance. If the decoration quality is unqualified, you will find that in the future life, you will find that places that you would not care about most now are the most troublesome areas for you. (2) Drainage should be smooth, no leakage, backflow and water phenomenon, high-grade water parts without clamp marks and rubbing phenomenon. If the quality of your work is not up to par, your bathroom will be beautifully decorated and there will always be a dirty floor and a pool of spoiled water. (3) It is a new masonry wall to be vertical, the bricks have the same level, the seams are even and tidy, the brick joints do not exceed 1 mm, and the overall tile error is not more than 0.8 cm. If you do not want to live in a home with a sense of space, check carefully whether the hand quality is acceptable. (4) It is the overall production error of the plane ceiling that does not exceed 0.5, the crack between the board and the board does not exceed 0.3mm, and the error of the plastic ceiling does not exceed 0.5mm. (5) It is not more than 0.2mm for the wood seal line, corner line, and waist line facing panel; the angle between the line and the line mouth is not more than 0.3mm; the interface between the veneer and the plate is not more than 0.2mm; the sliding surface of the sliding door is in error Not exceed 0.3mm. (6) The paint should be smooth, feel good, no traces of scratches, no color difference and nailing within one meter. (7) It is the straight line of the wall surface, and there is no obvious convexity and color difference within one meter. The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria. If the acceptance of the quality of the decoration manual failed there are also available. >>> When the country meets IKEA Happy house slave sun 55 flat small apartment decoration Construction acceptance entrance decoration restaurant decoration switch TV decoration home apartment decoration paint kitchen sliding door decoration home Bath Hardware Set,Brass Bath Hardware Set,Gold Bathroom Accessory Set,Luxury Bath Hardware Sets Kaiping Jenor Sanitary Ware Co., Ltd , https://www.kpjenorsanitary.com
Millennium boat plate    House home flagship store