The long and busy renovation will soon be over. Completion and acceptance is the final step in the renovation process, indicating that the hard-installed part has been completed. But how to check it? What need to pay attention to? This article will introduce the relevant knowledge of completion acceptance to everyone for inexperienced friends. Acceptance of Maintenance Benefits in Order It is advisable to follow the order in the inspection and acceptance. For the completion acceptance, the emphasis is on the acceptance of the “face†project and the “lizi†addition and subtraction in the decoration. It is recommended that the decoration company's supervisor be given a pre-inspection first, and then the owner shall examine the project items one by one in accordance with the provisions of the contract item, and then perform the inspection according to the order of the contract budget so as to avoid mistakes and omissions. After the completion of the acceptance, the decoration company will settle the final amount of the project. In order to avoid the miscalculation of the added item, the owner also needs to measure and verify the addition and subtraction items that appear during the renovation process and take this final step. After acceptance, the owner must sign a good warranty agreement with the decoration company to safeguard their own rights and interests. Hydropower acceptance: still the focus Although during the mid-term acceptance of the renovation project, the waterway has been subjected to a pressure test, the closed water test and the circuit laying have also been accepted for the concealment project. The owner, the foreman and the supervisor have signed the acceptance checklist. The pipeline part has been With basic quality assurance. However, the hydropower project also involves the installation of waterway accessories, electrical accessories, lamps, electrical products, etc., so it is still one of the focuses of the completion acceptance of the renovation project. Circuit installation acceptance is mainly through the lighting test, switch test control to see if the lighting, power is normal, the owner can also use electrician professional test pencil to test each socket to see if power, switch will open to see if there is a problem . Waterway installation acceptance is mainly to check whether the pipeline is firm, you can open the faucet to check whether it will jitter; also need to see whether the water supply pipe is smooth, there is no leakage phenomenon, mainly to see whether the joints and elbows have water droplets or appear Leakage, you can use paper towels to wipe the joints, elbow detection. In addition, it is necessary to check whether there is a phenomenon of "flooding" and "backslope" in the room with floor drain. You can turn on the faucet or shower, and after a period of time, see whether the flowing water is smooth and whether there is local water accumulation. In addition to this, it is also necessary to check whether the floor drain, the toilet and the wash basin are clean. Hydropower acceptance woodworking acceptance experience Expanded Metal Mesh ceiling panel is widely used in building decoration field nowdays Expanded Metal Mesh Expanded Metal Mesh,Black Expanded Metal Mesh,Carbon Steel Expaned Metal Mesh,Expanded Metal Grill Grate Anping shengsen metal wire mesh products co,. ltd , https://www.apshengsen.com
1.Materials : aluminium plate ,thin low carbon steel plate, stainless steel plate,Al-Mg alloy plate,
2.Types of holes : diamond , square, round , triangle scale,etc
3.Type of Sizes:
LWD: 12.5-200mm
SWD: 5-80mm
Thickness: 0.3-8mm
4.Packing: waterproof paper packing and woven bags or cartons in expanded metal roll mesh
5.usage :used in filter elements, medicine, paper-making, filtering, breeding, wire mesh for battery, wire mesh for satelite aerial, machina protecting , handcraft making and window screen substitute.
Expanded metal mesh usually packed with wooden pallets or wooden frame,then into the 40HQ
Stand for the final post decoration inspection
1 23 Next> Total 3 Pages
Page to page