Built up Frame Tubular Prefabricated Steel Structure

Model NO.: HK-869
Type of Steel For Building Structure: H-Section Steel
Carbon Structural Steel: Q235B, Q345b
Residential Wall Structure: Top Wall Beam
Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Features: Waterproof, Fireproof, Earthquake Resistant
Installation: Easy and Fast
Lifespan: 50 Years
Environment: Recyclable
Cladding: Colored Steel Sheet
Insulation: EPS, Rockwool, PU etc.
Color: Customized
Surface Treatment: Painted or Hot DIP Galvanized
Overhead Crane: Customized
Gutter: Galvanzied or SS304 Material
Transport Package: Nude Packing, Transport by 40FT Container
Specification: Customize
Origin: Xiamen
HS Code: 940690
Model NO.: HK-869
Type of Steel For Building Structure: H-Section Steel
Carbon Structural Steel: Q235B, Q345b
Residential Wall Structure: Top Wall Beam
Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Features: Waterproof, Fireproof, Earthquake Resistant
Installation: Easy and Fast
Lifespan: 50 Years
Environment: Recyclable
Cladding: Colored Steel Sheet
Insulation: EPS, Rockwool, PU etc.
Color: Customized
Surface Treatment: Painted or Hot DIP Galvanized
Overhead Crane: Customized
Gutter: Galvanzied or SS304 Material
Transport Package: Nude Packing, Transport by 40FT Container
Specification: Customize
Origin: Xiamen
HS Code: 940690
Description


Steel Construction includes steel column, steel beam, girder, C/Z purlin, roof bracing, column bracing, tie-bar, roofing sheet, wall sheet, center ridge cap, gutter, trims and flashing, door and windows, and other accessories (ventilation, canopy, translucent sheet, etc.).


Advantages:


1. Prefabricated: Fast and easy installation, save time and labor;
2. 
Customized design: different size, various layout, shape and appearance;
3. Light weight: lighter than concrete;
4. 
Removable
5. Environmental Friendly: recyclable, no waste produced;
6. 
High strength: can resistance grade 8 earthquake, water proof, fire proof, can resist strong wind and heavy snow.
7
. Long life span: more than 50 years.
8. 
Wide span: single or multiple spans, maximum span 60m without middle columns.



Specifications:
 
Description Steel Construction / Pre-Engineered Building Structure
Main Components Base Concrete and steel foundation anchor bolts
Main frame Hot Rolled or Welded H-Section Steel
Material Q235B, Q345B or others as per client's requests
Purlin C/Z purlin: Size from C120~C320, Z100~Z320
Bracing X-type or other type, angle or round pipe
Bolt Plain or High-strength bolt
Roof & wall EPS / Rockwool / PU Sandwich panel or colored steel sheet
Door Roller shutter or sliding door
Window Aluminum or PVC window
Surface Coating Anti-rust Paint or Hot Dip Galvanize
Sheet 0.3-0.8mm galvanized or color coated steel sheet
Accessories Translucent skylight sheet, Ventilators, etc.
PVC Down pipe, Galvanized / SS304 gutter, etc.
Usages 1. Workshop, warehouse, plant, storage
2. Steel web frame structure
3. High rise building project
4. Others steel structure buildings
Packing Main steel frame without packing load in 40' OT or 40'HQ
Roof and wall panel load in 40' HQ
Drawing By client or Honkae
Design Parameters If need design from Honkae, please supply following parameters:
1) Length, width, eave height, roof apex
2) Live Load, Wind Speed, Seismic Load, Snow Load etc.
4) Quantity and sizes for doors and windows
5) Other information if necessary


Production Procedure

1- Automatic Gas Cutting: cut steel plates;

2- Building Up: assemble the steel plates;

3- Submerged Arc Welding: weld the steel plates together into the required H-section or tubular shape;

4- Rectify: straighten the welded H-section or tubular member;

5- Manual Welding: weld the stiffener, base plate, top plate, purlin plate etc. into position;

6- Slag Cleaning: polish the slags by manually according to welding regulation, make the surface smooth;

7- Shot Blasting: sand blast the member to Sa2.5 grade;

8- Painting/galvanization: paint or galvanize the member according to requirements.

Built up Frame Tubular Prefabricated Steel Structure

9- Packing and loading: without packing directly load into container, or packed with steel rack, both are available according to client.

Built up Frame Tubular Prefabricated Steel Structure
Built up Frame Tubular Prefabricated Steel Structure
Built up Frame Tubular Prefabricated Steel Structure


Quality Inspection by client or third party is accepted during the whole procedure.


Services: 

1. Consultant service and preliminary design, assist client to choose suitable construction plan;

2. Quantity Survey, Bill of Quantity, Pricing.

3. Construction Manual, Installation and fabrication supervision.

4. Warranty after installation completed.

Built up Frame Tubular Prefabricated Steel Structure
Built up Frame Tubular Prefabricated Steel Structure
  Description


Steel Construction includes steel column, steel beam, girder, C/Z purlin, roof bracing, column bracing, tie-bar, roofing sheet, wall sheet, center ridge cap, gutter, trims and flashing, door and windows, and other accessories (ventilation, canopy, translucent sheet, etc.).


Advantages:


1. Prefabricated: Fast and easy installation, save time and labor;
2. 
Customized design: different size, various layout, shape and appearance;
3. Light weight: lighter than concrete;
4. 
Removable
5. Environmental Friendly: recyclable, no waste produced;
6. 
High strength: can resistance grade 8 earthquake, water proof, fire proof, can resist strong wind and heavy snow.
7
. Long life span: more than 50 years.
8. 
Wide span: single or multiple spans, maximum span 60m without middle columns.



Specifications:
 
Description Steel Construction / Pre-Engineered Building Structure
Main Components Base Concrete and steel foundation anchor bolts
Main frame Hot Rolled or Welded H-Section Steel
Material Q235B, Q345B or others as per client's requests
Purlin C/Z purlin: Size from C120~C320, Z100~Z320
Bracing X-type or other type, angle or round pipe
Bolt Plain or High-strength bolt
Roof & wall EPS / Rockwool / PU Sandwich panel or colored steel sheet
Door Roller shutter or sliding door
Window Aluminum or PVC window
Surface Coating Anti-rust Paint or Hot Dip Galvanize
Sheet 0.3-0.8mm galvanized or color coated steel sheet
Accessories Translucent skylight sheet, Ventilators, etc.
PVC Down pipe, Galvanized / SS304 gutter, etc.
Usages 1. Workshop, warehouse, plant, storage
2. Steel web frame structure
3. High rise building project
4. Others steel structure buildings
Packing Main steel frame without packing load in 40' OT or 40'HQ
Roof and wall panel load in 40' HQ
Drawing By client or Honkae
Design Parameters If need design from Honkae, please supply following parameters:
1) Length, width, eave height, roof apex
2) Live Load, Wind Speed, Seismic Load, Snow Load etc.
4) Quantity and sizes for doors and windows
5) Other information if necessary


Production Procedure

1- Automatic Gas Cutting: cut steel plates;

2- Building Up: assemble the steel plates;

3- Submerged Arc Welding: weld the steel plates together into the required H-section or tubular shape;

4- Rectify: straighten the welded H-section or tubular member;

5- Manual Welding: weld the stiffener, base plate, top plate, purlin plate etc. into position;

6- Slag Cleaning: polish the slags by manually according to welding regulation, make the surface smooth;

7- Shot Blasting: sand blast the member to Sa2.5 grade;

8- Painting/galvanization: paint or galvanize the member according to requirements.

Built up Frame Tubular Prefabricated Steel Structure

9- Packing and loading: without packing directly load into container, or packed with steel rack, both are available according to client.

Built up Frame Tubular Prefabricated Steel Structure
Built up Frame Tubular Prefabricated Steel Structure
Built up Frame Tubular Prefabricated Steel Structure


Quality Inspection by client or third party is accepted during the whole procedure.


Services: 

1. Consultant service and preliminary design, assist client to choose suitable construction plan;

2. Quantity Survey, Bill of Quantity, Pricing.

3. Construction Manual, Installation and fabrication supervision.

4. Warranty after installation completed.

Built up Frame Tubular Prefabricated Steel Structure
Built up Frame Tubular Prefabricated Steel Structure
 

Other Camping Light

Other Camping Light,Rechargeable Lantern,Led Kerosene Lamp,Tent Camping Lantern

NINGBO ZHENGUO INTELLINGENT LIGHTING CO.,LTD , https://www.intellingentlighting.com