For many people, the number of contact decoration is relatively small. When the decoration was first done, due to lack of understanding of the decoration, it may seem a bit at a loss, I do not know where to start. Anything to do beforehand is very important, and decoration is no exception. A thorough consideration and a sufficient understanding of the entire decoration before the official start will help your decoration to proceed more smoothly. The road should go step by step, decoration should also be carried out step by step, following the small make up together to understand the next seven steps of decoration. In the first 2 months of getting your new house key, you should begin to be prepared. For example, there is a target on the Internet to collect home improvement pictures, to find their own style of decoration; more decorative companies, and designers to discuss the renovation program; the development of a budget for decoration, and strict implementation of the preparation of the renovation plan to find their relatively leisure time; Coordinate the relationship between husband and wife and family, prepare for ideas, communicate and understand more, and don't complain about arguing about minor things in decoration. After a series of preparations are completed, you can start a complex and annoying renovation. First of all, we must clarify a scientific renovation process, so that in the process of renovation will not find a variety of items are not ready, delays the decoration process is not counted, but also because of the order of errors caused by the decoration effect greatly reduced. Step one, check home inspection room In order to ensure the smooth progress of the renovation, we must first fully understand our house so that we can prepare for the design. Steps of home inspection: first, check the documents; secondly, verify the area, calculate and implement the housing payment more than refund and less; third, check the house; fourth, check whether the facilities and equipment specified in the purchase contract are missing. , brand, quantity is consistent; fifth, acceptance of the public environment. In the acceptance stage we focus on the following aspects: First, check whether the doors and windows are closed, whether the door is open and closed smoothly, whether the installation is firm, how the sealing performance of the door is, and whether the door clearance is too large, especially the side of the door lock, and whether the four sides of the door are close to the door frame; Whether there is a special sound when the door is opened or closed. Second, observe whether there are cracks on the ceiling, walls and ground. Cracks parallel to the room beam do not substantially impede use. If the crack is at an angle of 45 degrees to the corner of the wall, or even perpendicular to the beam, then it is a sign that the subsidence of the house is serious and the house has serious structural quality problems. Look at the top if there are pits, that is, "lime burst point", will have an adverse effect on indoor re-decoration. Check the roof there are no water stains, cracks, waterlogging if there is any suspicion of leakage. Third, ask for the wiring diagram to facilitate the decoration changes, it is best to accompany the acceptance of the request for circuit wiring diagram, in order to prepare for reference in future maintenance. In this way, at the beginning of the renovation, changes can be easily made when carrying out hydropower reforms. Step two, selected furniture In considering the renovation of the house, you should first determine the style of furniture, choose the right furniture. Some friends who want to decorate will have misunderstandings, think that the first decoration and then select the furniture. However, in fact, it is often found that when decorating furniture, they will find it difficult to find furniture that suits their style of home decoration. Therefore, remember to choose the furniture first and decorate it. In addition, it is very necessary to listen to the advice of a friend who has experience in decorating the furniture. Decoration construction knowledge decoration steps Stainless Steel Sanitary ASTM A269 Stainless Steel Tubes is the main tubing line for a piping system. Generally, ASTM A269 Stainless Steel Tubes are made in stainless steel 304 and 316l, but we provide other grade too such as hastelloy C22, 316Ti, Titanium and nickel alloy etc. Kaysen offer both Sanitary Seamless Tubes and Sanitary Welded Tubes to ASTM A270, ASTM A249, A269, ASTM A554, DIN11850, and size is up to 12″. Inner and outer surface is polished to meet the high purity requirement of hygienic industries. Kaysen is ability to supplying qualified ASTM A269 Stainless Steel Tubes comply to your your condition and FDA,GMP requirement. ASTM A269 Stainless Steel Pipes ASTM A269 Stainless Steel Pipes, 1.4301 A269 Steel Pipes, SS316L Sanitary Pipes Kaysen Steel Industry Co., Ltd. , https://www.chinasanitaryvalve.com
ASTM A269 Stainless Steel Tubes - Sanitary Tubing
Material: SS304, SS316L, EN 1.4301, EN 1.4404, etc
OD diameter: 1/2" - 12"
Thickness: 0.5mm - 6mm
Standard: ASTM, JIS, DIN, JIS, SUS, GB
Length: 6m or customer made
Tolerance: OD. ±0.2mm; Thickness: ±0.02mm; Length: ±0.5mm
Surface Treatment: Matt Finish or Mirror Finish (320# 400# 600#) etc
Application: Boiler, heat exchanger, construction, hygienic, pharmacy, power, petrochemical
Strength:
Heat Treatment of solution annealing for the sanitary tubings and fittings are available
High precision on dimension and wall thickness
Both seamless and welded sanitary tubings are available
Length is up to 12 meters.
Min. order quantity of sanitary tubings is from 300Kgs.
Offer industrial pipe and tubes according to order.
PMI test to verify material grade.
Visual and surface 100% examination before shipment.
End protected for shipment.
Renovation compass 7 large renovation steps take you into the perfect home
1 23 Next> Total 3 Pages
Page to page