Tuocheng Cooling & Heating gives you science: how is the floor heating installed?

Tuocheng Cooling & Heating gives you popular science:

The basic principle of underfloor heating is to warm the indoor floor by certain means, so as to achieve overall indoor warming. There are many advantages of floor heating, which can make the room warm while ensuring that the air is not stuffy, making people feel very comfortable. There are many steps in the installation of such convenient equipment. The installation steps of floor heating engineering construction include leveling and fixing, laying insulation and wire mesh, fixed floor heating pipe clamps, water pressure test, inspection and refilling, setting filters, system pressure test completion Wait.


1. Leveling and fixing

Before the construction of the floor heating project, you should first remove unnecessary impurities on the ground, detect the leveling layer, and make the ground as clean and flat as possible. Then, use expansion bolts to fix the water collector horizontally on the wall.

2. Laying insulation layer and barbed wire

The second step in the construction of the floor heating project is to lay the insulation layer and the wire mesh after leveling and fixing, glue the wall along the insulation layer, and then place the wire mesh on the insulation layer and cover it with aluminum foil.

Three, fixed floor heating pipe card

After the relevant calculation of the spacing requirements, the floor heating is fixed with a floor heating pipe clamp. The distance between the fixed points is generally not more than 500mm, and the bending radius of the floor heating cannot be less than 8 times the outer diameter of the pipe.

4. Hydraulic test

After the previous process is correct, the floor heating project can be hydraulically tested and the water can be injected into the exhaust valve. If it is within the specification data and there is no leakage, it is qualified.

V. Fill in the inspection

After the acceptance of the floor heating pipeline is passed, the next step should be backfilling with fine stone concrete, and backfilling should ensure that the ground is level.

Six, set the filter

The construction of the floor heating project must install a filter in the water inlet area of ​​the water separator to prevent other impurities and foreign objects from entering the installed pipeline.

7. Completion of system pressure test

Connect the main pipe to the reservoir under pressure, and then enter the test system. The main reference index is that, within the specified time, the pressure drop does not exceed 0.02MPA. When the pressure drops to the working pressure, no leakage is qualified.

Geothermal Since the construction of the underfloor heating project is a hidden project and the pipeline goes to the ground, each step of the installation process is very important. The quality of the construction is directly related to the use of the family and the life of the floor heating. Therefore, when installing, you should find a professional and reliable Floor heating installation company, at the same time, it is best to have professionals to accompany the supervisor to ensure the quality of construction.

The above content is provided by Tuocheng Cooling and Heating . To find a good floor heating, choose Tuocheng Heating and Cooling !

56 Inch ABS Ceiling Fan

Ceiling Exhaust Fan,Big Ceiling Fans,Remote Fan,Crystal Ceiling Fan

JIANGMEN ESCLIGHTING TECHNOLOGY LIMITED , https://www.windfansummer.com