Three-bedroom and two-room house decoration process house decoration precautions

The decoration process of the house is also very particular, and the order of decoration of the house is very important. So, do you know the order of decoration of the three-bedroom and two-bedroom houses ? The decoration can not only improve the aesthetics and comfort of the house, but also improve our mood, but do you understand the decoration? The following small series will introduce you to the process of three-bedroom and two-bedroom decoration houses and some things to pay attention to!


三室两厅房屋装修


Three-bedroom and two-bedroom building renovation process and precautions - the mason entering the market

After knocking the wall, the garbage is cleaned up and the mud worker should enter the scene. The mud rig is mainly responsible for wall building, ash, sporadic repair, tiling, waterproofing, floor leveling and floor draining.


1. Cement mortar should be used for wall and ash, the difference is only in the proportion. The wall and the ash are the preliminary work of the muddy waterworker. After finishing these two items, the muddy water union will first measure the actual area of ​​the wall and the ash, and then he will recapture these sizes with the owner.


2. Compared with the rounded side wall bricks, the right angle side wall bricks are prone to unevenness or uneven bricks after paving. It is recommended that the right angle side wall surface should select higher quality products, and the economic investment is not very large. In the case, try to choose rounded wall tiles.


3 The construction requirements of the mosaic are relatively strict. The wall should be plastered and leveled first, and laid down from top to bottom. The pavement design of the wall flower and the floor decoration line should consider the arrangement of furniture and equipment to avoid obstruction and affect the space effect. When laying tiles in irregular spaces, the seams of the bricks are prone to clutter, and the influence on the space effect should be controlled.


4 The tile in a room is best to be posted by one person. If it is done by two people, the effect may be different because of the different styles.


5 In addition to the waterproof project to be constructed as required, after the waterproof construction is completed, the water storage test should be done. Pay attention to the moisture-proof in the humid space, the furniture with poor moisture resistance should be arranged in the dry space. When using the wooden furniture for the kitchen and dining room partition, it must be waterproofed; close to the bathroom cabinet and the wooden cabinet furniture of the kitchen wall The back side also needs to be protected from moisture.


Three-bedroom and two-room building renovation process and precautions - hydropower transformation begins

Before the muddy workers built the wall and the ash was added, the plumber entered the site at the same time to carry out hydropower transformation. The main tasks of hydropower transformation include hydropower positioning, grooving, pipe laying, and threading.


1 The first step of hydropower transformation is hydropower positioning, which is to determine the position of the whole house switch socket and the position of the waterway interface according to the needs of the user. The plumber should give the line to the user according to the position of the switch, socket and faucet. clear. Moreover, we must pay attention to the principle of “water going to the sky and electricity to go to the ground”, that is, the water pipes go to the ceiling, and the strong and weak electricity should go as far as possible to the ground, and the strong and weak electricity cannot cross each other and the parallel distance is more than 30 cm.


2 The installation design of distribution box and information box should be convenient, concealed and safe. It should also be connected directly to the external main line; the electric circuit should not be hidden in the building load-bearing wall or column.


The electrical circuit design of 3 sockets, switches and lamps should consider the variability of indoor space, prepare for possible different space usage conditions, and reduce the obstacles for re-planning design of some users during use, for example, desks, decorative cabinets, The impact of the movement of electrical equipment on electricity and water, at the same time, it should be noted that the price of new embedding and changing lines is not the same.


4 In the case of large weight of the luminaire, it is necessary to pay attention to the pre-buried load-bearing components in the ceiling, which cannot be directly installed on the wooden wedge to avoid indoor unsafe factors.


5 After the hydropower positioning, the next step is to slot. The slot made by a good slotting master is basically a straight line, and the slot edge has almost no teeth. Be sure to let the plumber draw all the water and electricity on the wall before marking the tank. Remember to check the water grid to see if it is consistent.


6 When renovating the waterway, be careful to be clean and tidy. When the waterway transformation contract is made, it is best to indicate the materials used for waterway reconstruction. In addition, in the reconstruction of the waterway, it is necessary to pay attention to the size of the water pipe in the original room. The pipe of the external water pipe is preferably matched with the original water pipe. The hot and cold water pipes should be left hot and right cold, and the spacing is generally not less than 20cm, depending on the distance between the hot and cold pipes of the faucet.


Three-bedroom and two-room house decoration process and precautions - woodworking enters the field to work

After the completion of the hydropower transformation, the woodworkers will enter the field.


1 When you get the designer's drawings, it's best to review the dimensions carefully before signing. Normally, the standard wood core board and veneer are 1.2m×2.44m, and the glass is 1.2m×2m. The production of the plane size exceeding the specification requires collage or special order. If the material plane and thickness specifications are neglected, it will be given. Production creates great obstacles and excessive expenses.


2 Woodworkers should bring their own tools such as toolbox, workbench, air compressor, etc., especially the workbench must not let the decoration workers use the wood bought by the owner, and must make clear with the decoration company or the decoration team foreman before the decoration.


3 Before the woodwork enters the market, the advanced board of the board, carefully look at whether the board entering the field is in line with the contract, whether it is genuine.


4 Like the plumber, woodworking is also a source of profit for the renovation team, and it is also a source of formaldehyde in the decoration. To control this, in addition to the board to comply with national environmental regulations, the wood paint used should also be selected.


三室两厅房屋装修


Three-bedroom and two-room house renovation process and precautions - painter on the scene

When the painter enters the scene, it is necessary to enter the putty after the muddy workers have finished the ash, and the wall surface is dry, which is the first stage of the paint. If the paint is applied twice the primer, then the wall must be sanded three times. The first time the sanding is done before the putty is finished, the sandpaper will be used to polish the finished putty wall. The second time is to finish the primer and dry the brush. Before the topcoat, the sandpaper used at this time is preferably higher than the sandpaper of the first pass; the third pass is before the first coat is applied and the second coat is applied after drying. Always use high-grade sandpaper to polish the wall surface. Only in this way can the wall surface be painted. Otherwise, after your wall is finished, there will be a feeling of feeling like flour in all likelihood. There is a certain limit on the proportion of water added to each type of paint. It should be noted that construction should be carried out in strict accordance with the construction instructions.


Three-bedroom and two-room house decoration process and precautions - decoration pollution control

In the current situation in China, almost all renovations have pollution. We don't want to be lucky. We don't think that we can control the decoration pollution by opening the window and venting the green plants. If so, the big companies that produce pollution control products will starve to death. Pollution is long-term and the hazards are huge and hidden, especially in preparation


What is the process of building renovation? What are the things that need our attention during the renovation? After reading the above introduction, I believe you understand it. House decoration is a big project, so it must be planned and designed, because only in this way, the renovated house will be beautiful. If you want to know more information, please continue to pay attention to the decoration home network.


More related wonderful reading:

How to decorate the house? What are the styles of house decoration?

House decoration porch Feng Shui house decoration porch Feng Shui taboo

Analysis of the order of house decoration

Housing renovation process introduction to the house renovation process

What is the decoration of Feng Shui in the house?

Smart Faucet

Smart Faucet,Smart Faucet Price,Smart Faucet Product

Yuyao Zelin Sanitary Ware Co., Ltd , https://www.zelinsinkfaucet.com