Where should new houses be waterproofed?

Citizen Lin: Recently, my family was decorating. Friends said that waterproofing was the top priority at home and I must pay attention to it. Where do you need to be waterproof?

Answer: The decoration engineer said that because the humidity is relatively large, the bathroom floor is the core part of the whole house, so the bathroom must be waterproof, and the wall should also be full height. At the same time, to do the secondary drainage and secondary waterproofing, the toilet sewers should also be carefully connected so that there is no leakage; if the ground developer made the original waterproof layer, then the original waterproof layer can not destroy it, first The ground is clean and the waterproof coating is repeatedly brushed 2 to 3 times; the seam between the wall and the ground and the pipe seam between the upper and lower water are the most easily leaked places, and must be handled well. Corner, waterproof paint must be brushed in place, not sloppy.

The wall adjacent to the bathroom, because Huizhou's weather is very humid in April and May, it is recommended to brush it once or twice, otherwise it will be the most likely to get wet in April and May. The paint made from the batch of ash may fall off. If you do waterproof it will be foolproof.

In addition, the kitchen should also be waterproof, but it is not as important as a bathroom. Because many homes are now relatively clean, cooking is very careful, so there is not much water, almost no water on the ground, that is, there will be immediately cleared of water, so the ground and the wall can only brush twice waterproof on the wall The surface does not need to be full height, and it is appropriate to make it around 1.5 meters. The balcony should be waterproof as well, so that it can be about 20 cm above the ground.

No matter what waterproof is done, it is recommended that waterproof tests be done after completion. Clean the ground first. If you wash with water, wait until the water is dry before you finish. After the waterproof project is done, seal the water outlet. Fill the toilet floor with water to a certain height and mark it. The water surface is within 48 hours. If there is no obvious drop, there is no leakage in the roof of the house, especially downstairs, to see if there is a watermark. If not, the waterproof will pass. If there is leakage, the acceptance will be unqualified, and the waterproof project must be redone as a whole and re-inspected. Do not ignore this link, be sure to do a test of water, or else if there is a leak afterwards, it will be too late to remedy it. After confirming that there are no leaks, lay the tiles again.

Release date:2012/4/16 10:40:28

Magnetic Lifter

Electro Permanent Magnetic Lifter,Permanent Magnetic Lifter,Electro Magnetic Lifter

Ningbo Hegao Magnetic Technology Co.,Ltd , http://www.allmagnetstores.com